Countryside Title 8 Ch. 14 Residential Rental Housing § 8-14-3-3
REQUIRED REPORTS
Operative Text
A. The licensee shall report to the Building Department any change in the designation of any managing agent within seven (7) days of said change. B. Any conveyance in the legal or equitable interest in the real property or any portion thereof shall be reported to the Building Department within seven (7) days after execution of a contract to convey and at least fifteen (15) days prior to said conveyance to allow ample time for the required presale inspection of the real property in accordance with section 8-10-6 of this chapter. C. At the time of initial license, the licensee shall provide to the Building Department a legible drawing depicting the following: 1. The unit numbers and location of each unit. 2. The location of each utility service disconnect, including, but not limited to: a. Water. b. Electric. c. Natural gas (if present). d. Fire alarm panel (if present). e. Fire sprinkler controls (if present). 3. The location of each knox box for emergency entry (if present). (Ord. 18-03-O, 2-7-2018; amd. Ord. 21-36-O, 9-22-2021)
Countryside Title 8 Ch. 14 § 8-14-3-3 establishes three ongoing reporting duties tied to residential rental housing licenses. License holders must notify the Building Department within seven days of any managing agent change, and must report any property conveyance both within seven days of contract execution and at least fifteen days before the transfer takes place. At the time a license is first issued, the licensee must also submit a legible floor-plan drawing showing unit locations, utility shutoffs, and emergency-access hardware.
Plain English — not legal advice.
Operators subject to Countryside Title 8 Ch. 14 § 8-14-3-3 generally maintain a practice of promptly updating the Building Department whenever a managing agent is replaced, tracking both the contract-execution date and the anticipated closing date for any property sale to meet the dual reporting windows, and preparing an accurate site drawing at initial licensure that identifies every unit, utility disconnect, and knox box. Keeping dated records of each notification helps demonstrate compliance with the seven-day and fifteen-day deadlines. The presale reporting window is specifically designed to allow the Building Department time to conduct the required inspection under section 8-10-6, so early notification is a routine part of a compliant sale process.
General guidance for property managers — not legal advice for your specific situation. Consult an attorney for advice on your case.
Under Countryside Title 8 Ch. 14 § 8-14-3-3, tenants have an interest in knowing that their building's licensing records—including who manages the property and who owns it—are required to be kept current with the Building Department. If a property changes hands or a new managing agent takes over without the required notifications, that may represent a licensing compliance issue that can be raised with the Countryside Building Department. Tenant-rights organizations familiar with local ordinances can help residents understand how these reporting requirements connect to broader protections, such as the presale inspection process referenced in section 8-10-6.
General guidance for tenants — not legal advice for your specific situation. Consult a tenant-rights organization or attorney for advice on your case.
Generated November 10, 2026 — auto-generated, not yet human-reviewed. See /transparency for methodology.
Effective Timeline
References Out
Rules and statutes cited by this regulation
References In
Rules and statutes that cite this regulation
Related Rules
Source Information
Use this in your app
Access this data programmatically via our API