Cambridge, Minn., City Code ch. 97 (2026) § 97.17

Completion of Exterior

In Force
Verified 11/13/2026 · Next check 2/11/2027
CambridgeHabitability & Repair

Operative Text

Cambridge, Minn., City Code ch. 97 (2026) § 97.17
§ 97.17 COMPLETION OF EXTERIOR
The roof and all exterior surfaces of dwelling unit buildings, and buildings and structures accessory
thereto, shall be completed with exterior finish materials within 12 months after the date of the building
permit issued for the new construction alteration, remodeling or relocation of such building or structure.
All such exterior surfaces of structure issued a building permit before the effective date of this section for
the new construction, alteration, remodeling or relocation of such structure shall be completed by 12
months after the date of issuing of such permit or October 31, 2003, whichever is later. The term “finish
materials” as used in this section shall mean stucco, brick, stone, shingles or shakes, redwood or cedar
siding, or other painted or stained siding materials, and shall include windows and doors.
Source: Legislative text reproduced verbatim
Plain English

Cambridge, MN City Code § 97.17 establishes a deadline for completing the exterior of residential buildings and their accessory structures. Once a building permit is issued for new construction, alteration, remodeling, or relocation, all exterior surfaces—including the roof, siding, windows, and doors—must be finished with qualifying materials such as stucco, brick, stone, shingles, wood siding, or painted or stained siding within 12 months. For permits issued before this section took effect, the deadline was either 12 months from the permit date or October 31, 2003, whichever came later.

Written by anthropic/claude-sonnet-4.6 · Reviewed on November 13, 2026

Plain English — not legal advice.

For Property Managers

Property owners and managers operating under Cambridge, MN City Code § 97.17 generally ensure that any permitted construction, remodeling, or relocation project reaches full exterior completion—roof, siding, windows, and doors using code-approved finish materials—within the 12-month window tied to the building permit issuance date. Compliant operators typically track permit dates carefully and coordinate contractors to meet this timeline, since unfinished exteriors on dwelling units or accessory structures can constitute a code violation. Maintaining documentation of permit dates and project completion milestones is a common practice for demonstrating compliance.

General guidance for property managers — not legal advice for your specific situation. Consult an attorney for advice on your case.

For Tenants

Cambridge, MN City Code § 97.17 gives tenants a basis to raise concerns if the exterior of their dwelling unit building or an accessory structure remains unfinished beyond the 12-month deadline following the relevant building permit. Tenants who observe an incomplete exterior—such as missing siding, unfinished roofing, or absent windows and doors—may consider contacting the Cambridge city building or housing code enforcement office to report a potential violation. Tenant-rights organizations can help explain what documentation to gather and what local complaint processes may be available.

General guidance for tenants — not legal advice for your specific situation. Consult a tenant-rights organization or attorney for advice on your case.

Generated November 13, 2026 — auto-generated, not yet human-reviewed. See /transparency for methodology.

Effective Timeline

Click on timeline segments to view historical versions.

References Out

No outbound references recorded yet for this provision.

References In

No inbound references recorded yet for this provision.

Related Rules

§ 244.260
Compliance required
§ 14.567
ADOPTED BY REFERENCE
§ 244.340
Sewer and water connections

Source Information

Snapshot SHA:
Fetched:Nov 13, 2026, 04:10 AM UTC