Brighton, N.Y., Code of Ordinances ch. 129 (eCode360 ed. 2026) § 129-11
Construction
Operative Text
The following shall apply to construction: A. For purposes of enforcement of this chapter, the prime or general contractor, if work is under progress, or the owner, if no work is under progress, shall be held responsible. B. Materials may be stored in any area of the property upon which construction is being carried on, provided that the method of storage and the materials stored are in compliance with the requirements of this chapter. C. Drainage crossing the property under development must be maintained during the period of development, and no materials may be stored, land disturbed or other work done to block drainage or to divert or cause runoff of groundwater or stormwater in an unnatural fashion. D. The person responsible as herein defined shall take all necessary and reasonable steps to ensure that there shall not be an unusual or unwarranted amount of dust and debris blown onto or across neighboring or nearby properties. E. Construction roads must be kept wet or properly treated to decrease the spread of dust and mud. F. A temporary cover such as rye grass or a mulch must be applied on land that has been stripped of its protective vegetation during the course of its construction to prevent the spread of dust and mud. G. All excavations in or near a public or private walkway or street must be properly guarded and protected at all times by lights, flags, barricades or other warnings sufficient in kind and amount to warn the public from the danger of falling into the excavation. H. Temporary electrical service must be through electric lines that are weatherproof and waterproof; such lines must not cross public walkways or highways on the ground, nor shall they be placed on the ground in areas subject to construction equipment traffic. I. Grounds and buildings must be kept free of debris such as broken glass, boards with fastenings protruding and other articles making travel around the job site dangerous and unsafe.
Brighton, N.Y., Code of Ordinances ch. 129 § 129-11 establishes a set of construction-site standards that govern who bears responsibility for compliance, how materials may be stored, and how hazards must be managed. The rule assigns accountability to the prime or general contractor while work is underway, or to the property owner when no active work is occurring. It also requires that drainage be preserved, dust and debris be controlled, excavations be guarded, temporary electrical lines be weatherproof, and cleared land be covered to prevent erosion.
Plain English — not legal advice.
Under Brighton, N.Y., Code of Ordinances ch. 129 § 129-11, property owners who are not actively engaged in construction remain the responsible party for code compliance on their site. Compliant operators typically ensure that drainage pathways are unobstructed, that stripped land receives temporary cover such as rye grass or mulch, that excavations near walkways are marked with lights or barricades, and that the site is kept free of dangerous debris. Owners generally coordinate with their contractors to confirm that temporary electrical service uses weatherproof lines routed away from public walkways and areas of equipment traffic.
General guidance for property managers — not legal advice for your specific situation. Consult an attorney for advice on your case.
Brighton, N.Y., Code of Ordinances ch. 129 § 129-11 protects neighboring residents and the general public from construction-related hazards such as uncontrolled dust, blocked drainage, unguarded excavations, and unsafe debris. If a nearby construction site appears to be causing conditions that violate these standards—such as dust blowing onto adjacent properties or unguarded excavations near a public walkway—residents may consider contacting Brighton's local code enforcement office to report the concern. Tenant-rights organizations or local housing advocacy groups can also help residents understand what remedies or complaint processes may be available under this chapter.
General guidance for tenants — not legal advice for your specific situation. Consult a tenant-rights organization or attorney for advice on your case.
Generated November 9, 2026 — auto-generated, not yet human-reviewed. See /transparency for methodology.
Effective Timeline
References Out
No outbound references recorded yet for this provision.
References In
Rules and statutes that cite this regulation
Related Rules
Source Information
Use this in your app
Access this data programmatically via our API