Red Creek, N.Y., Code of Ordinances ch. 157 (eCode360 ed. 2026) § 157-15

Contents of final plan

In Force
Verified 11/10/2026 · Next check 12/10/2026
Red CreekInspections, Registration & Licensing

Operative Text

Red Creek, N.Y., Code of Ordinances ch. 157 (eCode360 ed. 2026) § 157-15
The final plan for a mobile home park, or a portion of it if construction is to be staged, shall be prepared at the scale of 50 feet or 100 feet to the inch and shall show: A. Information shown or indicated on the preliminary plan. B. The accurate area and dimension of the proposed park marked by a monument on the corners of the park area. C. Layout of streets, mobile home sites, parking areas, and public spaces. D. Location of water, sewer and natural gas lines, fire hydrants and electric, telephone and TV service lines. E. A grade and drainage plan for the park prepared and certified by a professional engineer or land surveyor. F. Location and specification of buffers, office and utility buildings, trash collection areas, and mail distribution. G. Design of typical mobile home lot showing dimension, utility hookup and tie-downs.
Source: Legislative text reproduced verbatim
Plain English

Red Creek Code of Ordinances ch. 157 § 157-15 establishes the required contents of a final site plan for a mobile home park before development can proceed. The plan must be drawn to a precise scale and include detailed information covering everything from street layouts and utility lines to drainage engineering and individual lot designs. A professional engineer or land surveyor must prepare and certify the grade and drainage component of the plan.

Written by anthropic/claude-sonnet-4.6 · Reviewed on November 10, 2026

Plain English — not legal advice.

For Property Managers

Operators and developers of mobile home parks in Red Creek should ensure that their final plan, submitted under ch. 157 § 157-15, is drafted at either a 50-foot or 100-foot-to-the-inch scale and contains all seven categories of required information. Compliant operators typically engage a licensed professional engineer or land surveyor to prepare and certify the grade and drainage plan, and ensure that corner monuments, utility line locations, buffer specifications, and individual lot tie-down details are all documented. Staging construction in phases is permitted, but each phase generally requires its own conforming final plan segment.

General guidance for property managers — not legal advice for your specific situation. Consult an attorney for advice on your case.

For Tenants

Residents and prospective residents of mobile home parks in Red Creek may find § 157-15 relevant when evaluating whether a park was developed with properly documented infrastructure, including water, sewer, gas, and electrical service layouts. If a park's development appears to lack the required planning documentation—such as a certified drainage plan or clearly defined utility hookups—tenants can raise this as a concern with the local municipal authority responsible for code enforcement. Tenant-rights organizations familiar with New York mobile home park regulations can help residents understand what recourse may be available under this provision.

General guidance for tenants — not legal advice for your specific situation. Consult a tenant-rights organization or attorney for advice on your case.

Generated November 10, 2026 — auto-generated, not yet human-reviewed. See /transparency for methodology.

Effective Timeline

Click on timeline segments to view historical versions.

References Out

No outbound references recorded yet for this provision.

References In

Rules and statutes that cite this regulation

Red Creek Code § 157-16
Red Creek Code § 157-16

Related Rules

§ 14.544
LICENSE REQUIREMENTS
§ 14.545
STANDARDS FOR HEALTH, SAFETY AND NUISANCE PREVENTION
§ 14.546
SANCTIONS AND PENALTIES

Source Information

Snapshot SHA:
Fetched:Nov 10, 2026, 01:50 AM UTC