Wallkill, N.Y., Code of Ordinances ch. 140 (eCode360 ed. 2026) § 140-20
General requirements
Operative Text
A. Plumbing, heating, electrical, ventilating, air-conditioning, refrigerating, cooking, fire protection and radiation-production equipment, elevators, dumbwaiters, escalators and other mechanical additions, installations or systems for the use of the building shall be installed, located and maintained according to the provisions of the New York State Building Code and according to any local law or ordinance which may apply, so that under normal conditions of use such equipment and systems will not be a danger to health or welfare, a danger because of structural defects or a source of ignition or a radiation hazard, and will not create excessive noise or otherwise become a nuisance. Equipment and systems include, but are not limited to, apparatus, devices, fixtures, piping, pipe hangers, pipe covering, wiring, fittings and materials used as part of or in connection with such installations. B. Equipment and systems subject to damage from freezing shall be adequately protected against freezing. C. Moving parts of equipment which may be a potential hazard shall be guarded to protect against accidental contact.
Section 140-20 of Wallkill's Code of Ordinances requires that all mechanical systems and equipment in a building — including plumbing, heating, electrical, ventilation, elevators, and fire protection — be installed, located, and maintained in compliance with the New York State Building Code and any applicable local laws. Under normal use, these systems must not pose health, structural, or fire hazards, produce radiation risks, or create excessive noise or nuisance conditions. The provision also specifically requires that equipment vulnerable to freezing be protected against it, and that moving parts posing a hazard be guarded to prevent accidental contact.
Plain English — not legal advice.
Under Wallkill Code § 140-20, compliant property operators generally ensure that all building systems — from plumbing and HVAC to elevators and electrical wiring — are installed and maintained in accordance with the New York State Building Code and applicable local ordinances. Operators typically conduct regular inspections to confirm that freeze-vulnerable equipment is adequately protected during cold weather and that any moving mechanical parts with injury potential are properly guarded. Keeping maintenance records and promptly addressing deficiencies in any of the covered systems are practices commonly associated with ongoing compliance with this provision.
General guidance for property managers — not legal advice for your specific situation. Consult an attorney for advice on your case.
Section 140-20 of the Wallkill Code establishes that tenants are entitled to occupy a building where all mechanical systems and equipment are maintained in a safe, code-compliant condition — free from health hazards, structural dangers, fire risks, excessive noise, and nuisance conditions. If a tenant observes conditions that appear to violate these standards, such as unguarded moving parts, unprotected pipes that have frozen, or malfunctioning heating or electrical systems, they may consider documenting the issue and notifying the landlord in writing. Tenants can also explore filing a complaint with the appropriate local code enforcement authority in Wallkill or consulting a tenant-rights organization for guidance on available options under § 140-20.
General guidance for tenants — not legal advice for your specific situation. Consult a tenant-rights organization or attorney for advice on your case.
Generated November 9, 2026 — auto-generated, not yet human-reviewed. See /transparency for methodology.
Effective Timeline
References Out
No outbound references recorded yet for this provision.
References In
Rules and statutes that cite this regulation
Related Rules
Source Information
Use this in your app
Access this data programmatically via our API