HUD PIH Notice § 2026-23
Special Attention of:                               Notice PIH 2026-23
Public Housing Agencies
Public Housing Directors                            Issued: August 28, 2026
Regional Public Housing Directors
                                                    Expires: The notice remains in effect until
                                                    amended, superseded, or rescinded.

                                                    Amends: Notice PIH 2024-40

                                                    Cross References: 24 CFR 8.6, part 35, part
                                                    50, part 58, part 970, part 982, part 983; 28
                                                    CFR 35.160-163; 49 CFR part 24; Notices
                                                    PIH 2016-22, 2019-13, 2020-23, 2022-18,
                                                    2023-07, and 2026-16; Notices H-2016-
                                                    17/PIH 2016-17, H-2019-09/PIH 2019-23,
                                                    H-2023-08/PIH 2023-19, and H-2025-
                                                    01/PIH 2025-03


Subject: Demolition and/or Disposition of Public Housing Property, Eligibility for Tenant-
Protection Vouchers, and Associated Requirements

I.     PURPOSE
       Section 18 of the United States Housing Act of 1937 (42 U.S.C. 1437p) (“1937 act”)
       permits a public housing agency (PHA) to demolish or dispose of public housing
       property that is subject to a Declaration of Trust (DOT) or Declaration of Restrictive
       Covenants (DORC) with approval by HUD. HUD may only approve a PHA’s application
       if it determines that the statutory and regulatory requirements have been satisfied. This
       notice clarifies guidance for submitting a Section 18 Demolition and/or Disposition
       application pursuant to 24 CFR part 970 to release the project from Public Housing
       Program requirements.

       PHAs may request to remove property from their public housing portfolios if they have
       followed the required public input process described below to determine whether the
       reduction is in the public interest and consistent with the PHA’s mission. However, given
       the national need for affordable housing, most PHAs make the determination to preserve,
       renovate, or replace public housing and use the authority provided by section 18 of the
       1937 act to facilitate the project’s repositioning and improvement.

       For the purposes of this notice, “public housing” uses the definition at 24 CFR part
       905.108, and the definition includes all dwelling property, including units in mixed-
       finance transactions and non-dwelling property (e.g., vacant land, administrative


                                           www.hud.gov
                                                                                                 2


      buildings, community buildings) acquired, developed, modernized, operated, or
      maintained with 1937 act funds (e.g., capital funds and operating funds). This notice does
      not apply to PHA-owned Section 8 housing.

      Changes from the prior demolition/disposition notice (PIH 2024-40):

         Adjusted the size of a PHA in the definition of “very small PHA” (section III.A.3.c.)
         Increased the maximum number of units allowed to qualify as a scattered site project
          (section III.A.3.e.)
         Clarified how Section 18 demolition/disposition guidance applies to mixed-finance
          developments (section III.A.3.f.)
         Clarified when functional obsolescence may be used as a justification for demolition
          under 24 CFR part 970.15 or as an example that retention is not in the best interest of
          the tenants or the PHA under 24 CFR part 970.17(c) (section VI.B.)
         Removed barriers to consolidation of very small PHAs with larger PHAs (section
          III.A.3.c.)
         Guidance for discontinuance of a Special Application Center (SAC) application
          pursuant to 24 CFR 970.7 submission requirements (section V.A.)
         Clarified when buildings designated as severely distressed in an approved Choice
          Neighborhoods Planning Grant qualify for the physical obsolescence justification

II.   SAC APPLICATION REQUIREMENTS
      Demolition and disposition applications are reviewed by SAC in accordance with the
      requirements of 24 CFR part 970. SAC will only process applications that include all
      components in this section. PHAs wishing to demolish or dispose of public housing must
      submit their application through HUD’s Inventory Management System/Public and
      Indian Housing (PIH) Information Center (IMS/PIC). The same required supporting
      documentation (e.g., board resolution, resident consultation, government consultation,
      environmental review) may be submitted in support of multiple phases.

      A complete Section 18 application includes the following components, as applicable:

      A. PHA Plan Certification
         The PHA must certify that the proposed demolition or disposition of a public housing
         property is included in its most recent HUD-approved PHA Annual Plan (including
         any significant amendment to the PHA Plan) or Moving to Work (MTW) Annual
         Plan. All PHAs must discuss the demolition or disposition at a public hearing, as
         required by 24 CFR 903.7(h)(1). The PHA must comply with the resident
         consultation requirements for the PHA Plan, including discussing with its Resident
         Advisory Board (RAB) the proposed repositioning or redevelopment option,
         including demolition/disposition.

      B. Property Description
         A description of all identifiable property by development, including land, buildings,
         dwelling units, and other improvements, involved in the proposed demolition or
         disposition.
                                                                                             3



C. Removal Description
   A description of the specific action proposed. The PHA should indicate whether the
   application is for demolition, disposition, or demolition with disposition. If
   disposition is involved, the PHA should describe the method of sale. If demolition
   occurs after disposition, the transaction requires only a disposition application.

D. Timetable
   A general timetable for the proposed action(s), including the initial contract for
   demolition, the actual demolition, and, if applicable, the closing of sale or other form
   of disposition. Deviation from the proposed estimate time schedule may have
   negative effects on funding eligibility (e.g., Asset Repositioning Fee (ARF), Tenant
   Protection Vouchers (TPV)), and transaction requirements.

E. Justification
   A statement justifying the proposed demolition or disposition under 24 CFR part 970.
   Descriptions of potential justifications for disposition are included in section III and
   for demolition in section IV.

F. Relocation Plan
   If applicable, a plan for the relocation of tenants who would be displaced by the
   proposed demolition or disposition (including persons with disabilities requiring
   reasonable accommodations and a relocation timetable as prescribed in 24 CFR part
   970.21). The plan should include an estimate of costs for any required relocation
   housing, moving costs, and counseling. Relocation includes signing a new lease, even
   if no physical move occurs.

G. Resident Consultation
   A description with supporting evidence of the PHA's consultations with affected
   residents, any resident organizations, and the RAB, as required under 24 CFR part
   970.9(a). Affected residents include public housing residents living in other units not
   proposed for removal at the same development as the property proposed for removal
   (units or vacant land). If the public housing property is removed in multiple phases,
   and the PHA submits more than one SAC application, then consultation with the
   affected residents is required for each phase.

   The PHA must ensure communications and materials are accessible to individuals
   with disabilities and take reasonable steps to provide meaningful access to persons
   with limited English proficiency, pursuant to 24 CFR part 8.6 and 24 CFR part 35,
   subpart E.

   Along with a narrative of its consultation process, the PHA must attach evidence of
   consultation (i.e., sign-in sheets, dates, and agenda for meetings). The PHA must
   allow residents and their representatives to submit written comments regarding the
   PHA’s proposed Section 18 plan and must consider these comments when
   determining whether and how to proceed with a proposed demolition or disposition,
                                                                                           4


   including vacant land. If the PHA proposes a demolition-only application, the PHA
   must conduct a new consultation with residents if it later submits a disposition-only
   application for the same vacant land post-building demolition.

   As a best practice regarding resident consultation, SAC encourages the PHA to
   follow the Rental Assistance Demonstration (RAD) resident consultation
   requirements in Sections 3.3 and 4 of Notice H-2016-17/PIH 2016-17, or successor
   notices. All meetings must be made accessible to people with disabilities and provide
   language assistance for all residents. The PHA should conduct two meetings with
   residents before submitting the application, two meetings with residents after HUD
   accepts the public housing repositioning action, and one meeting before the final
   removal action occurs.

H. Offer of Sale to Resident Organizations (Disposition Only)
   Evidence that the PHA offered to sell a property that is subject to a disposition
   application to residents unless covered by an exception under 24 CFR part
   970.9(b)(3). A PHA requesting consideration of exceptions to 24 CFR part
   970.9(b)(1) must follow the process stated at 24 CFR part 970.9(b)(4). A resident
   entity with an interest in purchasing the property must make the request in writing to
   the PHA no later than 30 days after having received the notification of sale. For its
   purchase offer to be considered, the resident entity must demonstrate that it obtained a
   commitment for the necessary financing within 60 days of serving its written notice
   of interest under 24 CFR part 970.9(b)(1).

I. Fair Market Value (Disposition Only)
   PHAs must receive fair market value (FMV) for all dispositions unless a below FMV
   transaction meets the criteria in section V.J. A FMV estimate of the property must be
   provided, established on the basis of one independent appraisal (conducted within the
   last 12 months), unless otherwise determined by HUD. HUD generally requires that
   appraisals are made for the highest and best use of the Property as-is, and discounts
   (e.g., cost of demolition that occurs after disposition) should not be included. FMV
   cannot include seller credits or other seller discounts. Exceptions can be made
   regarding the cost of remediation required by HUD.

J. Gross and Net Proceeds (Disposition Only)
   In the case of disposition, estimates of the gross and net proceeds to be realized, with
   an itemization of estimated disposition costs to be paid out of gross proceeds and the
   proposed use of any net proceeds. All proceeds shall be used in accordance with 24
   CFR part 970.19(e) and Notice PIH 2020-23.

K. Board Resolution
   The PHA must obtain a signed resolution from its board of commissioners
   authorizing the PHA to submit the SAC application. The signed board resolution
   must be dated after all initial resident and local government consultation dates. The
   board must be consulted and approve all material parts of the SAC application
                                                                                          5


   including the justification, method of disposition (if applicable), use of proceeds,
   results of resident and local government consultation, and relocation plan.

L. Government Consultation
   Evidence that the application was developed in consultation with appropriate
   government officials as defined in 24 CFR part 970.5, including:

   1. Consultation Process
      A description of the process of consultation with local government officials,
      which summarizes dates, meetings, and issues raised by the local government
      officials and the PHA's responses to those issues;

   2. Letter of Support
      A signed and dated letter in support of the application from the highest elected
      official or chief executive officer of the unit of local government that
      demonstrates that the PHA has consulted with the appropriate local government
      officials on the proposed demolition or disposition;

   3. Documentation
      Where the local government consistently fails to respond to the PHA's attempts at
      consultation, including letters, requests for meetings, public notices, and other
      reasonable efforts, documentation of those attempts; and

   4. Multiple Jurisdictions
      Where the PHA covers multiple jurisdictions (such as a regional housing
      authority), the PHA must meet the previous requirements (1-3) for each
      jurisdiction where the PHA is proposing demolition or disposition of PHA
      property.

M. Environmental Requirements
   An approved environmental review of the proposed demolition or disposition is
   required. Proposed demolitions and disposition activities are subject to HUD
   environmental regulations in accordance with 24 CFR 970.13. The environmental
   review is conducted by HUD under 24 CFR part 50 or by a Responsible Entity under
   24 CFR part 58. Notice PIH 2016-22 provides environmental review guidance and
   requirements for PHAs. The PHA is responsible for providing the Responsible Entity
   or HUD reviewer with a full description of the activities, and any supporting
   materials to complete the environmental review.

   The environmental review covers the demolition and/or disposition and any known
   future use. Project aggregation requirements are explained in 24 CFR 50.21 and 24
   CFR 58.32; refer to 24 CFR 970.13(b) for factors in determining what constitutes a
   known future use. The environmental review may be valid for up to 5 years; however,
   the environmental review must be re-evaluated and updated when the basis for the
   original environmental or compliance findings is affected by a major change in the
                                                                                                       6


           nature, magnitude or extent of a project and the project is not yet complete per 24
           CFR 58.47 or 24 CFR 50.36 and as clarified in Notice PIH 2016-22.

       N. Civil Rights Certification
          A certification that the demolition or disposition application does not violate any
          remedial civil rights order or agreement, voluntary compliance agreement, final
          judgment, consent decree, settlement agreement, or other court order or agreement.

       O. Partial Removal
          To qualify for removal of only a portion of a public housing project, the PHA must
          certify that the removal will help to ensure the viability of the remaining portion of
          the project. If evidence is required, HUD may request the PHA submit future use
          plans after disposition and/or building plans demonstrating how the demolition will
          facilitate the renovation or reconfiguration of the remaining project units.

       P. Required Forms for Section 18 Removals
           Form HUD-52860 (required for all inventory removals)
           Form HUD-52860-A (required for all Section 18 applications)
           Form HUD-52860-B (required only for physical obsolescence applications)
           Form HUD-5837 (required only for close out of Annual Contributions Contract
             (ACC) and future development)

III.   DISPOSITION JUSTIFICATION
       In addition to other applicable requirements, HUD will approve a request for disposition
       by sale or other transfer of a public housing project or other real property if the PHA
       certifies that the retention of the property is not in the best interests of the residents or the
       PHA for one of the following justification criteria.

       A. Justification Criteria for Dwelling Units
          HUD approves SAC applications for dwelling unit dispositions based on one of the
          following three reasons:

           1. Surrounding Area (24 CFR 970.17(a))
              The PHA certifies that the conditions in the area surrounding the project (e.g.,
              density, industrial or commercial development) adversely affect the health or
              safety of the residents or the feasible operation of the project by the PHA. The
              PHA must support its application with at least one of the following:

               a. Health or Safety
                  The PHA demonstrates conditions that present serious obstacles in
                  maintaining the units as healthy or safe housing, and that the PHA cannot cure
                  or mitigate those conditions in a cost-effective manner. HUD encourages the
                  PHA to submit supporting documentation, which may include environmental
                  reviews. HUD may consider other available information including but not
                  limited to the analyses of land development, community facilities and
                  services, and natural features; or
                                                                                     7


   b. Infeasible Operation
      The PHA demonstrates a lack of demand for the units with supporting
      documentation that may include evidence that the units have long-term
      vacancy issues (e.g., census tract data on declining population in the
      jurisdiction, units located in an isolated area with limited access to
      transportation and infrastructure, high turnover rates). On a case-by-case
      basis, HUD may require a PHA to submit a market analysis or HUD may
      perform one.

2. Development of Off-Site Property That Will Be More Efficiently or Effectively
   Operated as Low-Income Housing (24 CFR 970.17(b))
   The PHA certifies that the disposition allows the acquisition, development or
   rehabilitation of other properties that will be more efficiently or effectively
   operated as low-income housing projects. The PHA must demonstrate to the
   satisfaction of HUD that sufficient replacement low-income housing units will be
   provided in connection with the disposition of the property. Low-income housing
   may include, but is not limited to, public housing, project-based Section 8
   housing, and housing developed with LIHTC. The disposition application should
   be submitted concurrently with the application for acquisition or development of
   the new units in the case of public housing or MTW local non-traditional housing
   or with the notice of proposal or project selection per 24 CFR 983.51(f) in the
   case of project-based vouchers (PBV).

3. Disposition is in the Best Interest of Residents or the PHA (24 CFR 970.17(c))
   The PHA certifies that it has determined the disposition is appropriate for reasons
   that are in the best interests of the residents or the PHA, consistent with the PHA
   goals and plans, and otherwise consistent with the 1937 act. In making such a
   certification, a PHA must consider the needs of its jurisdiction for public housing
   units, the goals and obligations of the PHA to operate, maintain, and provide
   decent and safe housing in accordance with its ACC, and other tools available to
   the PHA to preserve and reposition its public housing stock. Below are examples
   of circumstances where a disposition may be appropriate under best interest:

   a. Physical Obsolescence
      A PHA demonstrates that the units or buildings are obsolete as to physical
      condition in accordance with applicable criteria described in section VI.A.
      Physical Obsolescence looks at the immediate repairs needed over the next 3
      years as compared to the total development cost (TDC).

   b. Functional Obsolescence
      A PHA demonstrates that the development is functionally obsolete in
      accordance with applicable criteria described at section VI.B. A PHA must
      demonstrate that there are building and site design flaws that can only be
      addressed through the reconstruction of the property. The cost to address
      obsolete building features must exceed 57.14 percent of TDC for non-elevator
      buildings or 62.5 percent of TDC for elevator buildings. The PHA may not
                                                                                 8


   place PBVs at an existing structure that has been approved under section 18
   pursuant to the functional obsolescence justification.

c. Very Small PHAs
   The PHA owns and operates 75 or fewer public housing units under its ACC
   and demonstrates that it is in the best interests of the residents and PHA to
   close out its Section 9 Public Housing program in accordance with Notice PIH
   2019-13, or subsequent notice. For the purposes of this notice, such a PHA is
   referred to as a “very small PHA.” Following any voluntary transfer of a
   public housing program from a very small PHA to another PHA, the
   transferred units will remain eligible for repositioning under the very small
   PHA justification.

d. Development of On-Site Property That Will Be More Efficiently or Effectively
   Operated as Low-Income Housing (24 CFR 970.17(b))
   A PHA demonstrates that it can redevelop property to better meet the
   affordable housing needs of the community. The requirements of section
   III.A.2. apply except that the replacement low-income housing units will be
   located on-site. Low-income housing units may be rehabbed or replaced with
   newly constructed units. If the PHA is proposing to dispose of public housing
   units and rehabilitate those same units under the mixed-finance units in the
   Public Housing Program (24 CFR part 905), the PHA should submit the SAC
   application under the “MF-MOD” disposition application type in IMS/PIC.
   This ensures the PHA will continue to receive Capital Fund and Operating
   Fund subsidies for the units throughout the modernization period.

e. Scattered-Site Units
   A PHA demonstrates that the distance between units and lack of uniformity of
   systems (e.g., HVAC, utilities) makes it challenging to continue to operate
   and/or maintain the units as public housing. For purposes of this notice,
   scattered-site units are defined as six or fewer total units in contiguous or
   noncontiguous buildings on one side of a block.

f. Mixed-Finance Units
   A PHA demonstrates that the long-term viability of ACC units within a
   mixed-finance development is at risk as demonstrated by i) the expiration of
   the applicable Low-Income Housing Tax Credit (LIHTC) compliance period
   or passage of 15 years since the last major recapitalization event, and ii)
   documentation of capital needs and financial modeling indicating inadequate
   financial resources to address the underlying operational and capital needs. In
   such case, the PHA must provide a plan to ensure the property’s long-term
   financial and physical stability. HUD recommends that the new owner entity
   have a PHA, a PHA affiliate, or an instrumentality of a PHA as a holder of an
   interest in a general partner or managing member. For the purposes of this
   notice, mixed-finance units are those units developed as public housing under
   24 CFR 905.604 or its predecessor regulations.
                                                                                          9


           When requesting disposition of a mixed-finance development, the PHA would
           apply on behalf of, and with the consent of, the mixed-finance owner entity.
           Procedures for requesting a waiver of 24 CFR 970.3(a) will be published in
           subsequent guidance. HUD will assess whether a non-PHA mixed-finance
           owner is eligible to apply under the regulations or whether the owner must
           request a waiver of 24 CFR 970.3(a) so that the public housing development
           may be processed under section 18. PHAs seeking to project-base the TPVs
           resulting from the disposition hereunder should consider any restrictions or
           conditions on rehabilitation of an occupied structure under the PBV
           regulations and secure a waiver if such restrictions or conditions are
           inconsistent with their preferred implementation strategy. For guidance, email
           PIH’s Office of Urban Revitalization at OUR@hud.gov.

B. Justification Criteria of Non-Dwelling Buildings and Vacant Land
   (24 CFR 970.17(d))
   The PHA certifies and provides supporting documentation to demonstrate that
   disposition of non-dwelling buildings or vacant land meets one of the following
   criteria:

   1. 24 CFR 970.17(d)(1)
      The property exceeds the needs of the project after the date of full availability
      (DOFA); or

   2. 24 CFR 970.17(d)(2)
      The disposition of the property is incidental to, or does not interfere with,
      continued operation of the remaining portion of the development.

C. Blending Section 18 Disposition Approvals with RAD Conversion
   (24 CFR 970.17(c))
   Provided that a project meets the criteria outlined below, a PHA converting a portion
   of the public housing units within a converting project and is replacing the units
   proposed for disposition with project-based Section 8 assistance within the covered
   project may be subject to the provisions governing RAD/Section 18 blends, as the
   terms “converting project” and “covered project,” and “RAD/Section 18 blends” are
   defined in the RAD implementation notice and supplementary notices (Notices H-
   2019-09/PIH 2019-23, H-2023-08/PIH 2023-19, and H-2025-01/PIH 2025-03), as
   amended (“RAD notice”). The aggregate number of replacement units under project-
   based Section 8 must meet the RAD “substantial conversion of assistance”
   requirements as established in the RAD notice. All residents shall be treated
   uniformly and in accordance with RAD requirements, including the civil rights
   requirements and reviews described in the RAD fair housing, civil rights, and
   relocation notice (H-2016-17/PIH 2016-17). RAD/Section 18 blends are primarily
   processed by HUD’s Office of Recapitalization and are subject to RAD notice
   requirements and processes related to Financing Plan submission requirements,
   underwriting, DOT releases, terms of the disposition (e.g., treatment of proceeds),
   and placement of a long-term use agreement at the covered project.
                                                                                              10


          With the exception of a sequenced blend, described in paragraph 3 below, a PHA
          seeking a RAD/Section 18 blend must have submitted a RAD application in
          accordance with the RAD notice. To satisfy the applicable Section 18 regulations, the
          PHA must submit with the RAD Financing Plan the items described in this notice’s
          sections II.A., II.B., II.K., and II.L. In addition, when the assistance will be
          transferred off-site through the RAD/Section 18 blend, the PHA must also submit
          with the RAD Financing Plan the item described in section II.H. The item described
          in section II.H. is not applicable to an on-site RAD/Section 18 blend conversion
          pursuant to the exceptions set forth in 24 CFR part 970.9(b)(3). The items described
          in sections II.I. and II.J. are not applicable to RAD/Section 18 blends. The PHA does
          not need to separately submit the remaining items in section II of this notice as they
          are duplicative of RAD requirements, and the RAD requirements satisfy the Section
          18 statutory and regulatory requirements.

          1. RAD/Section 18 Construction Blend
             The percentage of units eligible for disposition under Section 18 within the
             converting project is based on the following: 1) whether that project will be
             demolished and redeveloped; 2) whether the assistance will be transferred to a
             new site under RAD; and 3) the ratio of a proposed transaction’s hard
             construction costs (including general requirements, overhead and profit, and
             payment and performance bonds) to the Housing Construction Costs (HCC)
             published by HUD for the given market area. A PHA seeking a RAD/Section 18
             Construction Blend must first submit a RAD application in accordance with the
             RAD guidance. The following table sets forth the eligibility criteria and unit mix
             for a RAD/Section 18 construction blend and, for each criteria, the maximum
             percentage of units eligible for Section 18 and the minimum number of units that
             will convert under RAD within the converting project:

Table: RAD/Section 18 Construction Blend Eligibility Criteria Unit Mix
                                                                         Unit Mix Percentage
 Eligibility
                                                                         (Section 18/RAD)
  Proposed rehab where hard construction costs exceed 90% of the        Up to 90% Section 18
   HCC for the given market area OR                                      and at least 10% RAD
  Demolition and redevelopment of the project OR
  Transfer of Assistance OR
  Developments designated as severely distressed housing in an
   approved Choice Neighborhoods Planning Grant OR
  Developments which meet the eligibility requirements set forth
   in the first sentence of section III.A.3.f. regarding mixed finance
   units
  Proposed rehab where hard construction costs exceed 60% of the        Up to 60% Section 18
   HCC for the given market area                                         and at least 40% RAD
  Proposed rehab where hard construction costs exceed 30% of the        Up to 30% Section 18
   HCC for the given market area                                         and at least 70% RAD
                                                                                              11


             In limited circumstances, prior to closing construction financing for the
             replacement units, HUD may approve a PHA’s request to demolish or dispose of
             public housing that is covered under a RAD Commitment to Enter into a Housing
             Assistance Payments (HAP) (CHAP) Contract. In such cases, the units may be
             eligible for a construction blend as long as proposed plans meet the above criteria.
             HUD will enter into a RAD/Section 18 Converted Awaiting Transfer (CAT)
             Agreement that will convert both the public housing assistance and the TPV
             assistance resulting from the Section 18 approval, allowing a HAP contract to be
             placed at a future date.

         2. RAD/Section 18 Small PHA Blend
            For any PHA with 250 or fewer public housing ACC units, at the PHA’s
            discretion, up to 90 percent of the units in a converting project may be disposed of
            under Section 18 and at least 10 percent of the units must be converted under
            RAD. The PHA is not required to remove all its remaining public housing units
            through a small PHA blend transaction. However, to be eligible for the Small
            PHA blend, the PHA must submit a Repositioning Plan to HUD. The PHA’s
            board of commissioners must approve the PHA’s Repositioning Plan, and it must
            be acceptable to HUD. The Repositioning Plan must explain how the PHA will
            remove all remaining public housing assets and close out the PHA’s Section 9
            ACC consistent with Notice PIH 2019-13 and subsequent guidance.

             Any units under a PHA’s ACC that resulted from a voluntary transfer of a public
             housing program from a very small PHA (as defined in section III.A.3.c.) to
             another PHA, are also eligible for the RAD/Section 18 small PHA blend. A
             Repositioning Plan is not required to convert these units under the RAD/Section
             18 small PHA blend.

         3. Sequenced Blends
            A PHA making a RAD application that has first received approval for a property
            under a Section 18 Disposition application under another justification under
            section III.A. (except for under section III.A.2. and section III.A.3.c. shall be
            subject to the provisions governing RAD/Section 18 blends provided they request
            and receive SAC approval to conditionally rescind the Section 18 approval for
            some portion of RAD eligible units and convert the public housing assistance of
            at least 10 percent of units under RAD.

IV.   DEMOLITION JUSTIFICATION
      In accordance with the ACC and the 1937 act, public housing property may not be
      demolished without prior HUD approval. In carrying out approved demolitions under
      Section 18 of the 1937 act, the PHA must comply with all applicable public housing
      requirements (e.g., procurement, Davis-Bacon wages, fair housing requirements). If the
      PHA uses capital funds to pay for the demolition, it must comply with all applicable 5-
      Year Annual Plan and other Capital Fund Program requirements.
                                                                                           12


If a PHA’s proposed demolition occurs after an approved and executed disposition of
public housing units or property under this notice and 24 CFR part 970, HUD approval is
not required for that demolition. However, the PHA cannot use Section 9 funds to
demolish the property.

A. Justification Criteria (24 CFR 970.15)
   HUD approves demolition requests meeting the following criteria: (1) the project or
   portion of a project is obsolete as to physical condition, location, or other factors,
   making it unsuitable for housing purposes; and no reasonable program of
   modifications is cost-effective to return the public housing project or portion of the
   project to useful life; or (2) in the case of an application for demolition of a portion of
   a project, the demolition will help to ensure the viability of the remaining portion of
   the project. These criteria may be satisfied in the following ways:

   1. Physical Condition (24 CFR 970.15(b)(1)(i) and (b)(2))
      The PHA certifies and demonstrates substantial physical conditions issues of the
      buildings/units that cannot be corrected in a cost-effective manner. See section
      VI.A. for more information on physical obsolescence criteria and required
      submission documents.

   2. Location (24 CFR 970.15(b)(1)(ii) and (b)(2))
      The PHA certifies and demonstrates that the location of the units causes
      obsolescence, including physical deterioration of the neighborhood; the
      neighborhood has substantially changed from residential to industrial or
      commercial; or environmental conditions are present which jeopardize the
      suitability of the site or a portion of the site and its housing structures for
      residential use. The cost test for location obsolescence includes the PHA’s cost to
      cure the obsolescence (e.g., buffering nearby industrial or commercial
      development; mitigating environmental conditions) and whether these costs
      exceed the TDC percentages for physical obsolescence. In some cases, there may
      be no way to cure obsolescence, regardless of cost (e.g., project is in a Federal
      Emergency Management Agency (FEMA) designated floodway). In other cases,
      obsolescence may be curable with a mitigation cost (e.g., floodproofing and flood
      insurance for designated floodplains).

   3. Other Factors (24 CFR 970.15(b)(1)(iii) and (b)(2))
      The PHA certifies and demonstrates factors impacting the marketability,
      usefulness, or management of the units that seriously impede operations for
      residential use with third party documentation. The cost test for obsolescence
      based on other factors includes the PHA’s cost to cure the cause and whether
      these costs exceed applicable TDC percentages. In some cases, curing
      obsolescence is not possible regardless of costs. In cases where obsolescence may
      be curable, the cost of due diligence in marketing and cost to cure obsolete factors
      (e.g., cost to add a second bathroom to units with a high number of bedrooms)
      may be included in the TDC test.
                                                                                             13


     B. Functional Obsolescence Functional Obsolescence (24 CFR 970.15(b)(1)(iii)
        Public housing units with a construction completion date of 1950 or older may be
        functionally obsolete and appropriate for demolition in accordance with applicable
        criteria described in section VI.B. A PHA must demonstrate that there are design
        flaws that can only be addressed through the demolition of existing units and
        construction of new units.

     C. De Minimis Demolition (24 CFR 970.27)
        In any 5-year period, a PHA may demolish the lesser of five dwelling units or five
        percent of its total public housing dwelling units without the need to obtain HUD
        approval under 24 CFR part 970. De minimis demolition is available only where the
        resulting space is used to meet the service or other needs of the residents, or the PHA
        determines the unit(s) are beyond repair. Prior to demolishing units under this
        authority, the PHA must provide information to HUD via IMS/PIC, including a
        description of the units to be demolished and other items required by 24 CFR
        970.7(a)(1), (2), (12), (13), and (14), environmental review under part 50 or 58, and
        required resident consultation pursuant to 24 CFR 970.9.

V.   OTHER REQUIREMENTS

     A. Discontinued Review
        Pursuant to 24 CFR part 970, substantially incomplete applications or otherwise
        deficient on material items will not be processed beyond the initial determining
        review. If the SAC determines that the PHA cannot provide the application
        submission requirements pursuant to 24 CFR 970.7 as requested within 30 days, the
        SAC will discontinue review of the application.

     B. Disapproval Criteria
        SAC reviews Section 18 applications in accordance with the requirements of 24 CFR
        part 970. Pursuant to 24 CFR 970.29, HUD will disapprove a SAC application if
        HUD determines: (1) a certification made by the PHA under 42 U.S.C. 1437p is
        clearly inconsistent with the PHA Plan or any information and data available to or
        requested by HUD; or (2) the application was not developed in consultation with
        residents, resident groups, and local government officials. It should be emphasized
        and recognized that a reason for disapproval is if the information presented is “clearly
        inconsistent” as presented in the PHA plan and in the application.

     C. Existing Financial Transactions
        A PHA with an approved transaction through the Capital Fund Financing Program,
        Section 30 (including PHA Mortgaged Transaction), Energy Performance
        Contracting (EPC), or Operating Fund Financing program must comply with
        additional instructions provided by HUD regarding such financing and may not take
        any steps to implement a SAC-approved application without receiving confirmation
        from HUD that all applicable requirements of the financing are satisfied. The PHA
        must certify an existing financial agreement is not at risk because of the proposed
        demolition or disposition action.
                                                                                        14


D. Operating Fund Accuracy and Relocation Timeline
   As part of the SAC application, a PHA includes an estimated number of days from a
   SAC-approved application that it plans to start relocation. Per 24 CFR 970.21(e)(1),
   the PHA is responsible for notifying each family residing in the development of the
   proposed demolition or disposition 90 days prior to the displacement date, except in
   cases of imminent threat to health and safety. Although relocation plans sometimes
   change, the PHA is responsible for ensuring the relocation information remains
   reasonably accurate because HUD relies on relocation information to determine
   operating funds. If days to relocation in a SAC application is not reasonably accurate,
   ARF payments under 24 CFR 990.190 will be affected. See Notice PIH 2026-16 or
   successor guidance on how to update relocation dates. The PHA shall not
   preemptively relocate residents from the proposed public housing units prior to
   receiving signed SAC application approval. Resident relocation shall follow the
   timeline approved in a PHA’s SAC application.

E. Re-Occupying Units Proposed for Removal
   24 CFR 970.25(a) requires that a PHA should not re-rent units at turnover while HUD
   is considering a SAC application. However, due to community needs or for other
   reasons consistent with its PHA Plan, a PHA may decide it is in the best interests of
   the PHA, its residents, and the community to re-occupy vacated units that are under
   SAC review. If the PHA proposes demolition or disposition because units are
   structurally unsound, located in a floodway, or otherwise uninhabitable, the PHA may
   not reoccupy the units. The PHA cannot re-occupy units after issuance of the 90-day
   relocation notice.

F. Reporting Requirements
   Within 7 days of completion of the public housing property removal action (e.g.,
   disposition by execution of the sale or lease contract/recorded release of DOT, final
   payment of demolition contract), the PHA must report the action in IMS/PIC, or as
   directed in any successor system as required under 24 CFR 970.35. HUD may require
   other reporting information. Such requirements will appear in the SAC approval
   letter.

G. False Certifications and HUD Enforcement
   Anyone who knowingly submits a false claim or makes a false statement in a Section
   18 Demolition/Disposition application is subject to criminal and/or civil penalties,
   including confinement for up to 5 years, fines, and civil and administrative penalties.
   (18 U.S.C. 287, 1001, 1010, 1012, 1014; 31 U.S.C. 3729, 3802).

H. Civil Rights and Labor Standards Requirements
   This notice does not modify a PHA’s fair housing, civil rights, or accessible housing
   obligations. It does clarify those obligations with respect to public housing
   demolition/disposition under Section 18.

   The PHA must carry out the removal action in compliance with all applicable civil
   rights requirements, including title VI of the Civil Rights Act of 1964, the Fair
                                                                                    15


Housing Act, section 504 of the Rehabilitation Act of 1973, title II of the Americans
with Disabilities Act of 1990, all regulations implementing these authorities, and
other applicable Federal, State, and local civil rights laws.

The PHA is always responsible for understanding and implementing the requirements
of HUD fair housing regulations and policies including the 1968 Fair Housing Act,
the Housing and Community Development Act of 1974, The Cranston-Gonzalez
National Affordable Housing Act, and the Quality Housing and Work Responsibility
Act of 1998. (See 42 U.S.C. 3608, 5304(b)(2), 5306(d)(7)(B), 12705(b)(15), and
1437C-1(d)(16).)

1. HUD Civil Rights Review
   HUD’s Office of Fair Housing and Equal Opportunity (FHEO) may conduct a
   civil rights review of certain SAC applications based on the removal justification,
   which may include applications for non-dwelling property. Pursuant to 24 CFR
   970.7(a)(17), HUD may request additional information, including information
   about the PHA’s compliance with nondiscrimination requirements in relocations
   under 24 CFR 970.21(a) and the PHA’s Annual Plan fair housing certification
   under 24 CFR 903.7(o).

2. Disclosure of Remedial Orders and Compliance Agreements
   In its SAC application, the PHA provides a certification that the demolition or
   disposition does not violate any remedial civil rights order or agreement,
   voluntary compliance agreement, final judgment, consent decree, settlement
   agreement, or other court order or agreement (per 24 CFR 970.7(a)(16)). In
   addition, the PHA states whether it is operating under any Federal, State, or local
   remedial order, compliance agreement, final judgment, consent decree, settlement
   agreement or other court order or agreement, including but not limited to those
   related to fair housing or other civil rights finding of noncompliance. If the PHA
   is operating under such a document, it must provide a citation to the document
   and attach a narrative describing how the proposed demolition or disposition is
   consistent with such document.

3. Federal Labor Standards and Economic Opportunity
   A PHA using HUD funds for demolition or disposition must comply with all
   applicable Federal labor standards of section 12 of the 1937 act (42 U.S.C. 1437j)
   (Davis-Bacon) and requirements of section 3 of the Housing and Urban
   Development Act of 1968 (12 U.S.C. 1701u), as amended. Activities include but
   are not limited to demolition and resident relocation. Under Section 3 and 24 CFR
   part 75, recipients of certain HUD financial assistance must provide employment,
   training, and economic opportunities to the greatest extent feasible to Section 3
   residents or business concerns. Recipients of HUD funds have Section 3
   obligations regardless of the amount of funds (see 24 CFR 75.3).
                                                                                         16


   4. Resident Consultation for Persons with Disabilities and Persons with Limited
      English Proficiency (LEP)
      To ensure individuals with disabilities have reasonable opportunities to consult on
      the SAC application, the PHA must ensure communications and materials are
      accessible and in compliance with section 504 of the Rehabilitation Act of 1973,
      24 CFR 8.6, the Americans with Disabilities Act of 1990, and 28 CFR 35.160-
      163. This includes ensuring that written and oral communications, including
      resident meetings, are provided in appropriate alternative formats as needed (e.g.,
      Braille, audio, large type, accessible electronic communications, assistive
      listening devices, sign language interpreters, computer-assisted real time
      transcription of meetings, large print documents, and accessible web-based and
      email communications).

       A PHA must provide equal access for persons with disabilities by conducting
       sessions at locations that are physically accessible to those persons, including
       individuals who use wheelchairs. Individuals with disabilities must receive
       services in the most integrated setting appropriate to their needs, meeting the
       needs of qualified individuals with disabilities that fully enable interactions. The
       PHA should be guided by the goal of maximizing participation in an integrated
       setting so that residents with disabilities and residents without disabilities may
       hear and consider each other’s views. Priority shall be given to on-site accessible
       locations (e.g., TV rooms or informal gathering places) even if this requires
       multiple sessions with smaller groups of residents.

       Title VI of the Civil Rights Act of 1964, HUD’s guidance on title VI and LEP
       discrimination (72 FR 2732), and regulations at 24 CFR part 1 require the PHA to
       take reasonable steps to ensure meaningful access to their programs and activities
       for persons who have limited ability to read, speak, or understand English (i.e.,
       individuals who have limited English proficiency or LEP persons). Written
       materials provided in English are to be provided in regularly encountered
       languages among the residents. The PHA may need to provide interpreters to
       communicate between different languages to ensure LEP persons have
       meaningful access. The PHA may hold meetings in languages other than English
       to provide direct communication and participation.

I. Lease Dispositions
   When redeveloping public housing sites, PHAs may transfer the right to develop the
   property to another party but maintain control through a ground lease, air rights,
   easement, or other encumbrances. A PHA may prefer to dispose through a lease
   instead of fee simple sale because it allows the PHA to retain long-term ownership,
   maintain real estate tax benefits, and control how the property is used during the
   lease. A ground lease, air rights lease, or easement requires a disposition application
   if the lease term is more than 1 year and does not qualify for an exception under 24
   CFR 970.3(b). The PHA must describe the terms of the lease in their Section 18
   application, including terms, payments (upfront or annual), and legal entity of
   proposed lessee. A lease is considered a negotiated disposition (vs. fee simple sale);
                                                                                         17


   and HUD will approve leases that satisfy all the relevant regulatory requirements
   found in part 970.

J. Below Fair Market Value Transactions
   A PHA must receive FMV when it disposes of public housing property to a non-
   affiliated entity. However, a sale for below FMV is permitted if HUD authorizes a
   negotiated sale for reasons found to be in the best interest of the PHA or the Federal
   government or determines that the transaction provides a commensurate public
   benefit to the community, the PHA, or the Federal government. HUD makes this
   determination on a case-by-case basis. HUD will generally find a commensurate
   public benefit if the disposed property will serve an affordable housing purpose that is
   roughly proportional to the fair market value of the public housing project and
   primarily serves low-income families (i.e., individuals earning at or below 80 percent
   of area median income (AMI)). Below FMV transactions will be subject to a 30-year
   use restriction with a low-income housing or other affordable housing purposes. Low-
   income housing may include, but is not limited to, public housing, project-based
   Section 8 housing, and housing developed with LIHTC. HUD encourages the PHA to
   give public housing residents priority for occupancy of the affordable housing units.
   Public buildings and infrastructure (including streets, bridges, schools, police and fire
   stations, and other public improvements) do not qualify as a commensurate public
   benefit.

   As part of the SAC application, a PHA may propose a preferred form of use
   restriction (e.g., LIHTC extended use agreement, HOME agreement, provision in
   ground lease, separate use agreement) and proposed minimum term, but the final
   form and term of use restriction must satisfy the requirement for commensurate
   public benefit. The PHA and the proposed acquiring entity shall be parties to the use
   restriction.

   Each affordable housing use restriction that satisfies the requirement for
   commensurate public benefit must meet the following requirements:

   1. Covenants Run with the Land
      All use restriction benefits and burdens must touch, concern, and run with the
      land, and are binding upon successors and assigns of the parties, including any
      HUD-approved transferee;

   2. Written Use Restriction Document
      The use restriction covenants must be evidenced by a written use restriction
      document that will be recorded against the Property in the first-priority position.
      The recordation must occur immediately after the release of the DOT and before
      the recordation of any ground lease. Any foreclosure, bankruptcy, or mortgage
      liens must be subject and subordinate to the use restriction document.
                                                                                        18


3. Use Restriction Survives Foreclosure
   The affordable housing use restriction must survive foreclosure of mortgages and
   other liens and be recorded in public land records. Any foreclosure, bankruptcy,
   or mortgage liens must be subject and subordinate to the use restriction document.

4. Use Restriction Document For RAD/Section 18 Blends
   The RAD Use Agreement or RAD Transfer of Assistance Restrictive Covenant
   satisfies the requirements for a use restriction document to be recorded.

5. Use Restrictions to Which HUD is a Party
   Any use restriction to which HUD is a party shall meet the following
   requirements and be subject to the following conditions:

   i. Conveyance and Other Transfers. Prior written HUD approval is required to
      convey, assign, transfer, lease, sublease, or otherwise dispose of the property
      or any interest therein or permit such a voluntary conveyance or transfer.
      Certain involuntary transfers of the property (e.g., to a secured lender upon
      default under the security documents or foreclosure) must be subject to the
      Use Restriction Document.

   ii. Mortgages, Encumbrances, Liens. Prior written HUD approval is required to
       mortgage or otherwise encumber the property. Notwithstanding this
       requirement, HUD approval is not required for: (a) the conveyance or
       dedication of land for use as streets, alleys or other public rights-of-way, (b)
       the granting of easements for the establishment, operation and maintenance of
       public utilities, and/or (c) the documentation of residential leases or other
       occupancy arrangements in the normal course of operation of the property.

   iii. Releases and/or Amendments Prior to Expiration of Term. Though HUD
        generally will not agree to release use restrictions, it will consider releases due
        to extraordinary circumstances on a case-by-case basis.

   iv. Expiration. Upon the expiration of the term, the use restriction shall cease and
       terminate, and the property shall be deemed automatically released of the use
       restriction and the covenants without the requirement of any further writing
       between the parties. Upon expiration of the use restriction, HUD will execute
       and deliver such documents that the owner shall reasonably request to release
       the use restrictions from the property title, thereby clearing the property.

   v. Events of Default and Notices. The PHA shall be primarily responsible for
      enforcing and monitoring the Acquiring Entity’s compliance with the use
      restriction. Further, the PHA and/or HUD may take whatever investigative
      steps necessary to ensure compliance with the Use Restriction Document upon
      an event of default. HUD will be notified if the property defaults by the
      monitoring agent of the affordable housing property.
                                                                                      19


          Records and Reporting. For the duration of the Use Restriction Term, the
          PHA shall retain records and annually report to its board of directors to
          confirm that the property is in compliance with the Use Restriction Document.
          The PHA shall provide such records to HUD whenever HUD approval is
          needed.

          Release of Declaration of Trust/Declaration of Restrictive Covenants. HUD
          will not release the DOT/DORC (Form HUD-52190) until it approves the
          final form of use restriction. HUD encourages the PHA to annually report
          compliance with the Use Restriction Document to its board of commissioners.

K. Changes After SAC Application Approval
   The PHA must comply with all terms of the SAC approval. Minor technical
   corrections to SAC approval letters (i.e., non-substantial changes to acreage,
   correcting building addresses, change in acquiring entity name, reduction in the
   number of units approved for removal, or future unit mix corrections that do not
   affect the commensurate public benefit) may be requested by emailing
   SACTA@hud.gov. If a PHA wishes to modify a removal into multiple phases, each
   future phase will need to be reviewed on a phase-by-phase basis and the
   commensurate public benefit must be met for each individual phase. Absent
   modification of a removal into multiple phases, no material changes may be made to
   the SAC approval letter. No units may be added or substituted after the SAC approval
   that were not part of the original application. Any material changes require a new
   SAC application submission.

   Material changes include, but are not limited to:

      Method of disposition modifications;
      Change in future use proposed at the property no longer matches the conducted
       environmental review;
      Change in the use restriction after recording;
      Public bid sale for less than 80 percent of the appraised FMV (the PHA must
       describe its due diligence in offering the public housing property for sale on the
       open and competitive market and its rationale for accepting an offer that is below
       80 percent of appraised FMV; alternatively, the PHA may submit an updated
       appraisal); and
      Revised terms of commensurate public benefit for below FMV disposition (the
       PHA must describe the revised future use of the property so HUD can confirm the
       commensurate public benefit). This includes a substantial reduction in the number
       of units to be developed.

   A PHA may request a new SAC application for material changes by emailing
   SACTA@hud.gov with evidence that the PHA consulted the residents, the RAB, and
   resident groups about the change as well as the board resolution approving the
   change. Only updated or amended portions of the original application require
   resubmission, however, the SAC may determine that a change in future use is so
                                                                                                   20


          significant as to require a supplemental or new environmental review by the
          responsible entity or HUD (see section II.M.). Modification requests made more than
          5 years after approval under the part 50 or 58 environmental review process will
          require re-evaluation by the responsible entity or HUD and will require a
          supplemental or new environmental review. Once a request for material changes has
          been approved, portions of the prior approval letter will be rescinded.

VI.   OBSOLESCENCE CRITERIA
      Buildings and units that are obsolete (physically or functionally) may be justified for
      removal as a demolition under 24 CFR part 970.15 or an example of conditions that
      justify a PHA’s certification that retention of the property is not in the best interest of the
      PHA or tenants for a disposition under 24 CFR part 970.17(c).

      If a project’s rehabilitation costs are 57.14 to 90 percent in a non-elevator building or
      62.5 to 90 percent in an elevator building of TDC, the PHA may voluntarily pursue a
      removal action for the project under: 1) physical obsolescence via demolition or
      disposition, or 2) functional obsolescence via disposition; or the PHA may choose to
      retain and rehabilitate the project with capital funds.

      If rehabilitation costs for a project exceed 90 percent of TDC, the PHA’s only choice is to
      pursue a demolition, pursue disposition, or use funds other than capital funds to address
      the project’s capital needs.

      A. Physical Obsolescence
         Physical obsolescence demolitions fall under 24 CFR 970.15(b)(1)(i) and (b)(2))
         physical condition. Physical obsolescence dispositions fall under 24 CFR 970.17(c)
         where the PHA certifies that retention is not in the best interest of the PHA and
         residents. Physical obsolescence issues may include, but are not limited to, critical
         structural issues, deficiencies in major systems, or deterioration due to prolonged
         deferred maintenance that needs to be addressed in the next 0 to 3 years. The PHA
         may submit Physical Needs Assessments (PNAs), government inspections (including
         condemnation orders), and/or independent architect or engineer’s reports as
         supporting documentation of physical conditions issues. HUD may also consider
         other available information, including Real Estate Assessment Center scores, Capital
         Fund program 5-Year Action Plans, EPC information, and/or on-site inspections by
         HUD staff.

          If a PHA has an approved Choice Neighborhoods Planning Grant that classifies
          certain developments or buildings as distressed, those units are eligible for removal
          under this section. The PHA must provide proof that the proposed units are included
          in a Choice Neighborhood distressed unit certification of an approved Choice
          Neighborhood Planning Grant.

          1. Submission Requirements
             Submission requirements to certify physical obsolescence:
                                                                                      21


      Form HUD-52860-B or successor form;
      Scope of Work Report. This includes a list of specific and detailed work items
       that require rehabilitation or repair, preferably prepared by an outside engineer
       or architect (see section VI.A.2.); and
      Microsoft Excel or other compatible editable table form document of scope of
       work rehab cost estimates (including allowable soft costs, see below); or
      Approved Choice Neighborhoods Planning Grant. For developments
       designated as severely distressed housing in an approved Choice
       Neighborhoods Planning Grant, the PHA shall submit a copy of that Choice
       Neighborhoods distressed unit certification in lieu of Form HUD-52860-B,
       Scope of Work Report, and Rehab Cost Estimate.

2. Scope of Work
   The scope of work should include the following:

      Estimates based on the standards outlined in the most recent International
       Building Code and National Fire Protection Association 5000 standards. The
       PHA may include local code requirements in choosing to include items in the
       scope of work (e.g., fire codes; requirements for natural disasters such as
       flooding or wildfires).
      Building systems (e.g., HVAC, plumbing, electric), external amenities (e.g.,
       roofs, doors, windows), and internal amenities (e.g., kitchens, bathrooms,
       flooring) limited to those that address immediate capital needs for a maximum
       of 3 years. Replacement costs are restricted to items evidenced to be in poor
       condition that require immediate replacement or with a remaining useful life
       of 3 years or less. Actual service life may depend on initial quality of the item,
       local environmental factors, use/abuse, and levels of routine maintenance. The
       age of an item alone is not evidence of need to repair or replace. Each item is
       individually estimated and may reference life cycle values per the RSMeans
       Facilities Maintenance and Repair Cost Data book.
      Underground utilities (e.g., sewer, water, gas, electric), regardless of
       distances, provided the PHA owns the utility and evidences the need for
       replacement.
      Mitigation costs of asbestos, lead-based paint, or other environmental issues
       supported by reports submitted with the SAC application.
      Structural defects when supported by reports from a licensed professional
       engineer.
      Accessibility improvements for persons with mobility, vision, hearing or other
       disabilities, provided improvements are consistent with standards, regulations,
       and other requirements under Section 504 of the Rehabilitation Act of 1973
       (including the Uniform Federal Accessibility Standards (UFAS)); Fair
       Housing Act; Americans with Disabilities Act (ADA); other applicable
       Federal authorities, State, or local requirements that exceed Federal baseline
       requirements; and accessibility requirements in remedial agreements or
       orders.
                                                                                   22


   Imminent or ongoing health and/or safety issues, even if such costs are
    otherwise not eligible, provided the PHA provides supporting documentation
    from an independent party evidencing the occurrence and resulting health
    and/or safety risks. Due to extreme weather events the cost of installing air
    conditioning or heating systems (where previously non-existent) may be
    included.
   Site access work or construction that is essential to completing items included
    in the building physical obsolescence mitigation, beyond 5 feet of a building
    exterior (e.g., retaining walls, required ADA compliance).

a. Items Generally Not Allowed in the Scope of Work
   HUD reserves the right to disallow items in a scope of work if HUD
   determines there are more cost-effective alternatives to address the
   rehabilitation or replacement needs. If the PHA completes major capital work
   after the scope of work is prepared, the PHA must include a description of that
   work in the SAC application. HUD generally does not allow the following
   costs to be included in a rehabilitation scope of work:

       Work associated with enhancements or improvements of working systems
        or fixtures at the project, including energy efficiency “green”
        improvements.
       Amenities not currently existing at the project (e.g., tankless water heaters,
        trash enclosures, washer/dryer hook-ups, garbage disposals, central air
        conditioning, new porches). HUD makes an exception for window air
        conditioning units if not pre-existing and meets local building code.
       Work items that address a project’s needs beyond immediate 3 years.
       Local code compliance if the building code requirements are otherwise not
        triggered by the rehabilitation/repair.
       Landscaping or other site work beyond 5 feet of the exterior walls of a
        building not related to mitigating physical obsolescence.
       Upgrading on-site utility lines that are otherwise in working condition.
       Work items associated with site improvements and appurtenances (e.g.,
        parking lots, security cameras, playgrounds, community centers), even if
        those site improvements or appurtenances exist and are in need of repairs.
       Replacing PHA personal property (e.g., appliances or other removable
        fixtures such as refrigerators, ovens, and window treatments).
       Generally, any work item listed in “Fair” or “Good Condition.”

b. Cost Estimates
   The following should be used for estimates of the eligible scope of work
   items:

       TDC comparisons per HUD-posted costs for the same year as the
        rehabilitation estimate is made (see 24 CFR 905.314).
       RSMeans cost index, Marshall and Swift cost index, or other accurate and
        reliable cost estimates (e.g., actual and competitive bids).
                                                                                          23


              HCC as defined in 24 CFR part 905, including existing items inside a
               building or within 5 feet of the exterior walls and costs to repair
               landscaping damaged due to rehabilitation.

       c. Physical Needs Assessment (PNA)
          If a PNA is used to establish the TDC, the PHA should describe the
          methodology used to prepare the PNA report including the number of units
          inspected and the ratio of vacant to occupied units inspected. An occupied
          building should inspect vacant and occupied units in a ratio representing the
          property’s vacancy rate.

           The PHA may not include additional costs attributable to inflation or “cost
           escalation.” For example, if a PNA completed in 2025 indicates a roof
           replacement is necessary in 2027, the PHA must use current estimated costs
           without any escalation, cost adjustments, or other means of adjusting for
           inflation for work projected to be undertaken/completed in 2027. Instead, the
           PHA should use 2025 cost index information.

       d. Allowable Soft Costs
          The maximum amounts for rehabilitation soft costs as a percentage of hard
          costs are available in the Mixed Finance Cost Control and Safe Harbor
          Standards or successor guidance.

B. Functional Obsolescence
   Functional obsolescence demolitions may fall under 24 CFR 970.15(b)(1)(iii) other
   factors, and dispositions may fall under 24 CFR 970.17(c) best interests of the PHA
   and residents. The PHA may demonstrate that the removal is in the best interest of
   residents in order to address building and site design flaws that can only be addressed
   through reconstruction of the property. The PHA may not place PBVs at an existing
   structure that has been approved under section 18 pursuant to the functional
   obsolescence justification.

   HUD considers the following criteria in evaluating a PHA’s request for disposition or
   demolition on the basis of functional obsolescence: whether (1) the property
   construction date was completed in 1950 or earlier; (2) the building is functionally
   obsolete as to interior utility, configuration, size, or absence of reasonable modern
   amenities or other factors, making it unsuitable for housing purposes without
   modification; (3) the site (in addition to dwelling units present) is functionally
   obsolete as to unit density, environmental hazards, 504 site accessibility, or absence
   of reasonable modern amenities or other factors; and (4) potential demolition and
   redevelopment will not result in the net loss of affordable housing for families
   earning 80 percent of AMI or less, considering both replacement units and issuance of
   TPVs, as the issuance of TPVs may satisfy the requirement that affordable housing is
   not lost. Displacement of residents or a net loss of affordable housing may indicate
   that the transaction is not in the best interest of residents.
                                                                                               24


          Submission requirements to certify functional obsolescence:

          1. Construction Completion Eligibility Date
             PHA must demonstrate that the proposed units have a construction completion
             date on or before 1950. PHA must provide documentary evidence of construction
             completion date. PHAs can use the HUD’s IMS/PIC as supporting documentation
             if the construction date meets the construction completion eligibility date.

          2. Functional Obsolescence Documentation
              The PHA must provide documentation describing the functional deficiencies
              within the building (e.g., ADA noncompliance; the unit configurations no longer
              meet current living standards, for example only 1 bathroom for units with 3 or
              more bedrooms, bedrooms that lack closets, bedrooms smaller than 70 square
              feet for 1 occupant, or 50 square feet per occupant for bedrooms with multiple
              occupants) that have seriously affected the marketability, usefulness, or
              management of the property. A PHA wishing to address a functionally obsolete
              property site must describe the site design flaws (e.g., insufficient affordable
              housing density, challenges meeting Section 504 accessibility requirements) that
              cannot be corrected in a cost-effective manner. This can be provided in the
              application as a summary report with images and cost estimates evidencing
              design flaws. The cost to address obsolete building features must exceed 57.14
              percent of TDC for non-elevator buildings or 62.5 percent of TDC for elevator
              buildings. The same allowable soft costs apply for functional obsolescence
              rehabilitation as for physical obsolescence.

VII.   RELOCATION OF RESIDENTS

       A. Relocation Requirements
          When residents will be displaced from their public housing units or lose public
          housing assistance due to a demolition and/or disposition, the PHA must follow the
          relocation requirements at 24 CFR 970.21 (as opposed to the relocation requirements
          at 49 CFR part 24, which implements the Uniform Relocation Assistance and Real
          Property Acquisition Policies Act of 1970 (URA), as amended). 24 CFR 970.21
          requires that a PHA must offer each displaced household comparable housing that
          meets housing quality standards (HQS) and that is located in an area that is generally
          not less desirable than the location of the demolished/ disposed housing. The housing
          must be offered on a nondiscriminatory basis, without regard to race, color, religion,
          creed, national origin, disability, age, familial status, or gender, in compliance with
          applicable Federal and State laws. For persons with disabilities displaced from a unit
          with reasonable accommodations, comparable housing should include similar
          accommodations. The PHA is required to provide for the payment of the actual and
          reasonable relocation expenses of each displaced resident, including residents
          requiring reasonable accommodations because of disabilities.

          However, if the proposed acquisition, rehabilitation, or demolition is to be carried out
          with HUD funds subject to URA requirements or is to be carried out with other HUD-
                                                                                                                                         25


                funded activities subject to URA requirements, the URA may apply to tenant
                relocations. Additionally, if HUD Community Development Block Grant or HOME
                funds are used in the demolition or when property is converted to a use other than
                lower-income dwelling units, the project may be subject to Section 104(d) of the
                Housing and Community Development Act of 1974, including relocation assistance
                and one-for-one replacement provisions under 24 CFR part 42 subpart C.

          B. Quality of Relocation Units
             In accordance with 24 CFR 970.21, PHAs must offer each family displaced by
             demolition or disposition comparable housing that meets HQS1. In addition, in
             accordance with 24 CFR 982.404 and 24 CFR 983.208, if the comparable housing
             offered is housing choice voucher (HCV) assistance under 24 CFR part 982 or PBV
             under 24 CFR part 983, the owner must maintain the unit or units (with respect to
             PBV) in accordance with HQS. If the owner fails to maintain a dwelling unit in
             accordance with HQS, the PHA must take enforcement action in accordance with 24
             CFR 982.404 with respect to HCV and 24 CFR part 983.208 with respect to PBV.

          C. Relocation Considerations
             If residents are relocated from the public housing units due to demolition or
             disposition activity and the PHA intends to build or otherwise provide affordable
             replacement housing for the public housing units proposed for removal, the PHA
             must comply with all relevant statutes and regulations relating to the residents' first
             right to return and occupy the new replacement units.

          D. Housing Search
             In accordance with 24 CFR 970.21, PHAs must provide any necessary counseling for
             residents that are displaced. When the PHA is relocating families with HCV
             assistance (including TPVs), HUD encourages the PHA to provide families with
             mobility counseling and utilize the HCV program and the HUD Exchange Housing
             Mobility Toolkit. See Notice PIH 2022-18 for guidance on the use of HCV
             administrative fees to assist HCV families to lease units.

VIII. ELIGIBILITY AND APPLICATION PROCESS FOR TPV

          A. TPV Eligibility
             Upon approval of a SAC application, a PHA may be eligible to receive tenant
             protection vouchers to assist in meeting relocation or ongoing housing requirements
             for the residents of the former public housing project. The issuance of TPVs to a PHA
             does not occur automatically with SAC approval of an application. Instead, the PHA
             must apply separately for TPVs in accordance with HUD’s annual notice


1
  With the National Standards for Physical Inspection of Real Estate (NSPIRE) standards, available in HUD’s website, HUD has consolidated the
minimum standards of housing quality across its programs (and, therefore, replaced pre-NSPIRE HQS inspection standards). Yet, the regulations
at 24 CFR parts 982 and 983 governing the HCV and PBV Programs will continue to use the terms “HQS” and “housing quality standards” rather
than NSPIRE. This is because the definition of HQS at 24 CFR 982.4 and 24 CFR 983.3 means the minimum quality standards developed by
HUD in accordance with 24 CFR 5.703 for the HCV and PBV Programs, including any variations approved by HUD for the PHA under 24 CFR
5.705(a)(3).
                                                                                                26


         implementing HCV appropriations act funding provisions (HCV funding notice) and
         any additional HUD guidance after the SAC application is approved.
         HUD determines a PHA’s TPV award based on annual appropriations, the HCV
         funding notice, and other HUD-issued guidance. HUD’s approval of the SAC
         application may indicate the maximum number of both relocation and replacement
         TPVs that a PHA may be eligible to receive.

         Based on limited availability of TPV funding, HUD limits the maximum TPV awards
         to 25 percent of the occupied units at the development for dispositions under the
         improved efficiency or effectiveness (section III.A.2. for off-site development or
         section III.A.3.d. for on-site development). Units previously occupied but now vacant
         may also qualify for TPV funding. For more information, please refer to the most
         recent notice establishing funding provisions for the HCV Program. A PHA must
         comply with relocation requirements of 24 CFR 970.21 regardless of the size of any
         voucher award.

      B. TPV Application Process
         Refer to the SAC approval letter for the TPV application process.

IX.   PRESIDENTIAL ACTIONS AFFECTING FEDERAL FINANCIAL ASSISTANCE
      All recipients of Federal financial assistance are responsible for making sure activities
      funded by Federal awards comply with applicable existing and future executive orders
      and other Presidential actions, whether the recipients carry out those activities directly or
      use contractors or subrecipients. Review these directives on the White House’s
      Presidential Actions webpage.

X.    PAPERWORK REDUCTION ACT
      The information collection requirements contained in this notice are approved by the
      Office of Management and Budget (OMB) under the Paperwork Reduction Act (PRA) of
      1995 (44 U.S.C. 3501, et. seq.). In accordance with the PRA, HUD may not conduct or
      sponsor, and a person is not required to respond to a collection of information unless the
      collection displays a currently valid OMB Control Number. The active information
      collections in this notice include OMB Control Number 2577-0075 and 2577-0029. HUD
      is in the process of updating OMB Control Number 2502-0612.

XI.   CONTACT
      Direct questions about this notice to SACTA@hud.gov or your local field office.




                                            Benjamin Hobbs
                                            Assistant Secretary
                                            for Public and Indian Housing

Source: Legislative text reproduced verbatim
Plain English

PIH Notice 2026-23 establishes the federal framework under which public housing agencies (PHAs) may demolish or dispose of public housing property under Section 18 of the 1937 Housing Act, subject to HUD approval through the Special Application Center (SAC). The notice sets out required application components—including resident consultation, environmental review, relocation planning, and government consultation—and defines justification criteria for both demolition and disposition. It also governs eligibility for Tenant Protection Vouchers (TPVs) and outlines civil rights, relocation, and labor standards obligations that accompany any approved removal action.

Written by anthropic/claude-sonnet-4.6 · Reviewed on September 28, 2026

Plain English — not legal advice.

For Property Managers

Under PIH Notice 2026-23, compliant PHAs submit complete SAC applications through IMS/PIC, including board resolutions, resident and government consultation documentation, environmental reviews, and a relocation plan meeting 24 CFR 970.21 standards. Operators ensure communications are accessible to persons with disabilities and those with limited English proficiency per 24 CFR 8.6. PHAs also maintain accurate relocation timelines, report completed removal actions within 7 days in IMS/PIC, and comply with all civil rights and Davis-Bacon labor standards throughout the process.

General guidance for property managers — not legal advice for your specific situation. Consult an attorney for advice on your case.

For Tenants

PIH Notice 2026-23 requires PHAs to consult with affected residents—including RAB members—before submitting a demolition or disposition application, and to provide at least 90 days' notice before any displacement. Residents have the right to submit written comments on proposed Section 18 plans, receive comparable replacement housing meeting HQS, and may be eligible for Tenant Protection Vouchers. Tenants who believe a PHA has not followed required consultation or relocation procedures may contact HUD or a local tenant-rights organization for guidance on available options.

General guidance for tenants — not legal advice for your specific situation. Consult a tenant-rights organization or attorney for advice on your case.

Generated September 28, 2026 — auto-generated, not yet human-reviewed. See /transparency for methodology.

Effective Timeline

Current
Sep 28, 2026
Click on timeline segments to view historical versions.

References Out

No outbound references recorded yet for this provision.

References In

No inbound references recorded yet for this provision.

Related Rules

§ 574.605
§ 574.605 Applicability of uniform administrative requirements, cost principles, and audit requirements for Federal awards.
§ 574.625
§ 574.625 Conflict of interest.
§ 574.645
§ 574.645 Coastal barriers.