Ala. Admin. Code r. 535-X-11 § 535-X-11-.06

Quality Control Procedures And Requirements

In Force
Verified 10/16/2026 · Next check 10/23/2026
effective 10/16/2026AlabamaInspections, Registration & Licensing

Operative Text

Ala. Admin. Code r. 535-X-11 § 535-X-11-.06
(1) All manufacturers must submit a quality control manual to the Commission. The manufacturer shall designate an officer within the organization to be responsible for maintaining records to substantiate that each manufactured building has been inspected according to the control procedures set out in the manual, and that each unit is in compliance with the plans submitted to the Commission.

(2) The quality control manual must be submitted in duplicate and shall include in addition to the requirements of paragraph (1) of this rule the following:

(a) An index.

(b) The name of the company or corporate officer of the manufacturer to be responsible for the quality control program.

(c) Procedures for maintaining a record system indicating the type and date of inspections performed on each unit, accompanied by copies of forms to be used.

(d) The place and method of storage of materials and components, indicating the degree of protection from weather and capacity to control such factors as temperature and humidity where required to prevent deterioration of materials.

(e) A general outline and/or scheme indicating the sequence of the manufacturing and assembly process, indicating the sequence, type, and frequency of quality control procedures to be instituted, and the type and frequency of those inspections to be performed by the manufacturer.

(f) Sufficient information to substantiate the performance of prefabricated structural components and assemblages. If the components are not approved by a recognized listing organization, the following should be submitted:

1. A report on required tests performed by an approved quality assurance agency.

2. Complete details of the components and their incorporation in the building.

3. Verification of approved quality control during fabrication of the test specimens and during factory production of the components. Approval by a listing organization does not guarantee that some or all of the above information will not be required.

(g) Method of storage of completed units.

(h) Method of and manner of transporting units to storage area and installation site and also the method of placing units on site. The following calculations must be included:

1. Calculations or tests to show that the unit will perform under transportation stresses.

2. Show in sketch form proven methods of placing units on site. These designs should include lift point designation(s), jacking stresses, etc.

(3) When a manufacturer proposes changes in the quality control manual or procedures, three copies of such proposed changes shall be submitted to the Commission.
Source: Legislative text reproduced verbatim
Plain English

Alabama Administrative Code r. 535-X-11 § 535-X-11-.06 establishes a formal quality control framework that manufactured building producers must follow when seeking Commission approval in Alabama. Under this rule, manufacturers are required to prepare and submit a detailed quality control manual—covering everything from inspection records and material storage to transportation methods and structural component testing—and to keep that manual current whenever procedures change. The rule is designed to ensure that each manufactured building unit is built and handled in accordance with the plans and standards the Commission has reviewed and accepted.

Written by anthropic/claude-sonnet-4.6 · Reviewed on October 16, 2026

Plain English — not legal advice.

For Property Managers

Property owners and developers who source manufactured buildings in Alabama should be aware that § 535-X-11-.06 places significant documentation obligations on the manufacturers supplying those units. A compliant manufacturer will have a Commission-approved quality control manual on file, a designated officer overseeing inspection records, and documented procedures for storage, transport, and on-site placement. When evaluating a manufactured building supplier, operators generally confirm that the manufacturer's quality control program is current and that any manual amendments have been submitted to the Commission in triplicate as required by this rule.

General guidance for property managers — not legal advice for your specific situation. Consult an attorney for advice on your case.

For Tenants

Tenants living in or considering a manufactured building in Alabama benefit from knowing that § 535-X-11-.06 requires the building's manufacturer to maintain documented quality control procedures covering inspections, structural components, and transportation—all reviewed by the Alabama Commission. If a tenant has concerns about whether a manufactured unit was built or handled in compliance with approved plans, they may look into whether the manufacturer's quality control records are in order as required by this rule. Tenant-rights organizations and the Alabama Commission itself can be starting points for understanding what documentation should exist and what avenues are available when compliance questions arise.

General guidance for tenants — not legal advice for your specific situation. Consult a tenant-rights organization or attorney for advice on your case.

Generated October 16, 2026 — auto-generated, not yet human-reviewed. See /transparency for methodology.

Effective Timeline

Current
Oct 16, 2026
Click on timeline segments to view historical versions.

References Out

No outbound references recorded yet for this provision.

References In

No inbound references recorded yet for this provision.

Related Rules

§ 14.544
LICENSE REQUIREMENTS
§ 14.545
STANDARDS FOR HEALTH, SAFETY AND NUISANCE PREVENTION
§ 14.546
SANCTIONS AND PENALTIES

Source Information

Snapshot SHA:
Fetched:Oct 16, 2026, 12:33 PM UTC