Ala. Admin. Code r. 535-X-11 § 535-X-11-.07
Construction Plan Requirements
Operative Text
(1) Manufacturers making application for plan review will be required to submit plans showing all elements relating to a specific basic model on a sheet or sheets properly identifiable as such. Any alternate method of construction to the basic model (structural, plumbing, mechanical, or electrical) must be shown on separate plan sheets and also be identifiable as such. (2) The manufacturer or a legally constituted officer must submit a written statement in letter form and notarized that the manufacturer is manufacturing according to the plans submitted to the Commission. (3) Complete plans and specifications are to be submitted with the stamp and written signature of a registered architect and registered engineer as required by the rules of the Board of Registration of Architects and the Alabama Board of Engineers. A written statement in letter form and notarized shall be included with the submittal requirements stating that the registered professional has drawn the plans according to the codes adopted by the Commission. (4) All copies of plans shall indicate the manufacturer's name, address, and location. (5) Indicate or designate all work to be performed on site, including connections of all systems. (6) All plan drawings must: (a) Provide details for and show method of field connection of units or modules to each other and foundations. (b) Show all exterior elevations. (c) Provide elevations and details of elevations, walls, or sections thereof providing resistance to vertical loads or lateral forces. (d) Provide a complete floor plan and floor framing plan. (e) Provide complete details of the framing system showing direction of face grain of plywood, blocking, connections, etc. (f) Provide vertical load calculations. (g) Provide lateral force calculations and indicate maximum wind speed. (h) Provide complete details of all structural connections such as chord splices, corner and wall intersection details, post and beam connections, beam splices, etc. Both in-plant and on-site connections must be shown. (i) Provide complete roof framing plan showing method of framing, direction of face grain of plywood, connections, etc. Show roof covering material and roofing specifications on drawings. (j) Provide cross sections as necessary to identify major building components. (k) Provide information on plans for plywood when used, such as thickness, index number, grade, etc. Lumber grades should also be listed using the national design specifications for stress grade lumber and its fastenings. (l) Indicate details of flashing, such as at openings and at penetrations through roof. Indicate flashing material and gauge to be used. (m) Show attic access and attic ventilations. (n) Indicate exterior wall and soffit material as well as finish. (o) Indicate interior wall and ceiling finish. (p) Provide fire separation details, where required by code. (q) Show opening treatment for doors and windows including door swings. (r) Show all foundation vents and underfloor access when an element of manufactured building. (s) Describe all structural steel materials, sizes, finish, and connection details in accordance with the American Institute of Steel Construction Design Manual. (t) Describe all reinforcing, concrete and mesh materials, strengths, grades, sizes, spacings, and details in accordance with American Concrete Institute Building Code AC 318-71. (u) All drawings must be noted as to all work that is required on the job site.
Alabama Administrative Code r. 535-X-11 § 535-X-11-.07 establishes the documentation that must accompany a manufactured building plan review application submitted to the Alabama Commission. Plans must cover every structural, plumbing, mechanical, and electrical element of each basic model, with alternates shown on separate sheets, and must bear the stamp and notarized attestation of a registered architect and engineer. The rule also specifies a detailed checklist of drawing content—ranging from floor framing plans and lateral force calculations to flashing details and fire separation—that every complete submission must address.
Plain English — not legal advice.
Property owners or managers involved in the acquisition or placement of manufactured buildings in Alabama should be aware that under r. 535-X-11 § 535-X-11-.07, the manufacturer bears primary responsibility for submitting compliant construction plans to the Commission before approval is granted. A compliant manufacturer typically ensures that a registered architect and engineer have stamped and signed the plans, that a notarized letter from a legally constituted officer accompanies the submission, and that all required drawing elements—such as wind speed calculations, foundation connection details, and roof framing plans—are fully documented. Operators who commission or purchase manufactured buildings generally confirm that the manufacturer has satisfied these plan review requirements prior to delivery and site installation.
General guidance for property managers — not legal advice for your specific situation. Consult an attorney for advice on your case.
Tenants residing in or considering a manufactured building in Alabama may find it useful to know that r. 535-X-11 § 535-X-11-.07 requires manufacturers to submit detailed, professionally certified construction plans to the state Commission as part of the approval process. This rule is designed to ensure that the structural, mechanical, plumbing, and electrical systems of a manufactured building have been reviewed against adopted codes before the building reaches occupants. Tenants who have concerns about whether a building was properly approved may consider contacting the Alabama Commission, reaching out to a local tenant-rights organization, or consulting an attorney familiar with manufactured housing regulations.
General guidance for tenants — not legal advice for your specific situation. Consult a tenant-rights organization or attorney for advice on your case.
Generated October 16, 2026 — auto-generated, not yet human-reviewed. See /transparency for methodology.
Effective Timeline
References Out
No outbound references recorded yet for this provision.
References In
No inbound references recorded yet for this provision.