R.I. Gen. Laws ch. 23-24.6 § 23-24.6-17

Lead hazard reduction

In Force
Verified 10/26/2026 · Next check 11/2/2026
effective 10/15/2026Rhode IslandState Additions

Operative Text

R.I. Gen. Laws ch. 23-24.6 § 23-24.6-17
(a) The director shall promulgate lead hazard reduction regulations. These regulations
shall:


(1) Specify the circumstances under which owners of dwellings, dwelling units, or premises
must undertake lead hazard reduction in order to remedy conditions that present a
clear and significant health risk to occupants of the dwelling, dwelling unit, or
premises;


(2) Define lead hazard reduction with respect to both the sources of lead that must be
treated and acceptable and unacceptable treatment methods;


(3) Require owners to make all reasonable efforts to ensure that occupants are not present
during the lead hazard reduction; variances may be granted according to regulations;
provided, that the owners are not responsible for providing alternative housing. If
the occupants refuse to vacate the premises after all reasonable efforts by the owner
to ensure compliance within this section, then the owners are exempt from any liability
arising out of the occupants' noncompliance. If the occupants are required to vacate
the premises for a three (3) day period or longer, there shall be a pro-rata adjustment
or abatement of the rent during the period of lead hazard reduction;


(4) Specify containment and clean up measures to be taken as part of lead hazard reduction
activities;


(5) Contain measures to protect the occupational safety and health of lead inspectors,
contractors, supervisors, workers, and other persons who perform lead hazard reduction
which may be more, but not less, stringent than applicable federal standards; and


(6) Specify the circumstances under which owners of dwellings, dwelling units, or premises
must undertake lead hazard reduction to at least the lead safe level of protect occupants
and neighbors.


(b)(1) Until November 1, 2005, the owner of any dwelling, dwelling unit, or premises shall
be considered as an "innocent owner", and liability as to lead poisoning is limited
to the reduction of any lead hazard as determined by a comprehensive environmental
lead inspection within the requirements of the Housing Maintenance and Occupancy Code,
chapter 24.3 of title 45. The "innocent owner" provision will cease upon the owner's unreasonable failure
to correct any lead paint violation within ninety (90) days of notice as provided
in that chapter. Provided, any owner who has received notices on three (3) or more
properties shall be presumed to be an unreasonable failure to correct.


(2) "Innocent owner" status, and the limits on liability set forth in this subsection,
shall not apply to any incident of childhood lead poisoning reported to the department
on or after November 1, 2005, and liability for lead poisonings after November 1,
2005, but shall include such correction of lead hazards as may be required by this
chapter.


(c) The owner of any dwelling, dwelling unit, or premises who fails to provide for lead
hazard reduction as required by department regulations shall be issued a notice of
violation by the director in the manner provided by the Housing Maintenance and Occupancy
Code, chapter 24.3 of title 45. In addition to any other enforcement authority granted under this chapter, the department
shall have the authority to utilize pertinent provisions of that code in enforcing
this section in the same manner as an enforcing officer under the code, including
but not limited to the provisions of §§ 45-24.3-17 — 45-24.3-21, except that the director or his or her designee may provide a reasonable time up
to ninety (90) days for the correction of any violation alleged and, except where
there exists a hardship as to financing the lead hazard reduction, or where material,
personnel, or weather delays the reduction completion. Except as herein provided,
if after ninety (90) days following the date of issuance of a notice of violation
by the department, the owner has failed to correct the lead hazards, the department
shall issue a second notice of violation.


(d)(1) One or more lead paint waste depositories shall be established and be in operation
by January 1, 1993. The department of environmental management shall work with the
solid waste management corporation to promulgate regulations governing these lead
paint waste depositories.


(2) Each lead paint waste depository may set fees to cover the costs of lead paint waste
storage, reduction, consolidation, incineration, and/or out of state disposal.
Source: Legislative text reproduced verbatim
Plain English

Rhode Island General Laws § 23-24.6-17 establishes a framework requiring the state director to issue regulations governing lead hazard reduction in dwellings and rental units. Under this provision, property owners must address lead hazards that pose a clear and significant health risk, follow specified treatment methods and cleanup standards, and make reasonable efforts to keep occupants away during reduction work. If occupants must vacate for three or more days, the rent is to be adjusted or abated on a pro-rata basis for that period, and owners who lose 'innocent owner' status after November 1, 2005, face broader liability for childhood lead poisoning incidents.

Written by anthropic/claude-sonnet-4.6 · Reviewed on October 15, 2026

Plain English — not legal advice.

For Property Managers

Under § 23-24.6-17, property owners are generally expected to comply with the director's lead hazard reduction regulations, which define which lead sources must be treated and which methods are acceptable. Compliant operators typically document their reasonable efforts to ensure occupants are not present during reduction work, and they arrange for pro-rata rent adjustments or abatements when occupants must vacate for three or more days. Owners who receive a notice of violation from the department generally have up to ninety days to correct identified lead hazards, and those who have received notices on three or more properties may be presumed to have unreasonably failed to correct violations, affecting their liability status.

General guidance for property managers — not legal advice for your specific situation. Consult an attorney for advice on your case.

For Tenants

Section § 23-24.6-17 provides that tenants who must vacate their dwelling for three or more days during lead hazard reduction work are entitled to a pro-rata rent adjustment or abatement for the period they are displaced. Tenants also have the protection of knowing that owners are required to follow state-regulated containment and cleanup standards during any lead hazard reduction activity. Tenants who believe their landlord has failed to comply with lead hazard reduction requirements may consider contacting the Rhode Island Department of Health, consulting a tenant-rights organization, or exploring whether a notice of violation has been or can be issued under this provision.

General guidance for tenants — not legal advice for your specific situation. Consult a tenant-rights organization or attorney for advice on your case.

Generated October 15, 2026 — auto-generated, not yet human-reviewed. See /transparency for methodology.

Effective Timeline

Current
Oct 15, 2026
Click on timeline segments to view historical versions.

References Out

Rules and statutes cited by this regulation

References In

Rules and statutes that cite this regulation

R.I. Gen. Laws § 23-24.6-17
R.I. Gen. Laws § 23-24.6-15
R.I. Gen. Laws § 23-24.6-4

Related Rules

§ 194
Detection of sources of lead poisoning; inspection; search warrant; notice; examination of children; reports; records
§ 189A
Definitions applicable to Secs. 189A to 199B
§ 193
Lead poisoning early identification program; examination and reports

Source Information

Snapshot SHA:
Fetched:Oct 15, 2026, 04:35 PM UTC