Cal. Civ. Code § PSC 113.0803

Individual electric meters required for non-transient multi-dwelling unit residential buildings, mobile home parks and for commercial establishments.

In Force
Verified 10/26/2026 · Next check 11/2/2026
effective 10/15/2026WisconsinSubmetering

Operative Text

Cal. Civ. Code § PSC 113.0803
PSC 113.0803 Individual electric meters required for non-transient multi-dwelling unit residential buildings, mobile home parks and for commercial establishments.
(1) Each dwelling in a multi-dwelling unit residential building or mobile home park constructed after March 1, 1980, shall have installed a separate electric meter for each such dwelling unit. Dwelling unit means a structure or that part of a structure which is used or intended to be used as a home, residence or a sleeping place by one or more persons maintaining a common household and shall exclude transient multi-dwelling buildings and mobile home parks: for example, hotels, motels, campgrounds, hospitals, community-based residential facilities, residential care apartment complexes or similar facilities, nursing homes, college dormitories, fraternities, and sororities.
(2) Each tenant space in a commercial building constructed after March 1, 1980 shall have installed a separate electric meter.
(4) For the purpose of carrying out the provisions of subs. (1) to (2), individual unit metering will not be required:
(a) For a commercial building where the commercial unit space requirements are subject to alteration, as evidenced by temporary versus permanent type of wall construction separating the commercial unit spaces. Examples of temporary wall construction are partition walls which do not extend through the ceiling and walls which do not constitute a code-required fire separation.
(b) For electricity used in central heating, ventilating and air conditioning systems.
(bm) For a multi-dwelling unit residential building that meets one or more of the following conditions:
1. The electric equipment under tenant control meets established high energy efficiency standards consistent with standards used in a statewide energy efficiency programs under s. 196.374 (2) (a), Stats., federal energy efficiency standards, or other similar energy efficiency standards or programs and the average electric energy use per unit is projected to be less than half of the average monthly residential use per customer in Wisconsin based on the previous five-year average of U.S. energy information administration data, Wisconsin energy statistics, or similar state or federal government data. Onsite energy technologies that offset overall usage shall be factored into usage projections.
2. For a newly constructed building, the building design meets high energy efficiency standards. A building design meets high energy efficiency standards if the developer or owner of the building participates in programming for newly constructed buildings offered through a statewide energy efficiency program under s. 196.374 (2) (a), Stats., or a similar program.
3. The building is under contract with a local, state, or federal affordable housing program.
(5) For reasonable cause shown, the commission may grant waivers of this rule on a case-by-case basis. Applications for a waiver must be submitted to the commission in writing and set forth the facts or reasons the applicant believes justify a waiver.
Source: Legislative text reproduced verbatim
Plain English

Wisconsin Administrative Code § PSC 113.0803 requires that most multi-dwelling residential buildings and commercial buildings constructed after March 1, 1980, have a separate electric meter installed for each individual dwelling unit or tenant space. Transient facilities such as hotels, dormitories, and nursing homes are excluded from this requirement. Certain exceptions apply, including buildings enrolled in affordable housing programs, buildings meeting high energy efficiency standards, and commercial spaces with flexible or temporary wall configurations. The Wisconsin Public Service Commission may also grant case-by-case waivers upon written application showing reasonable cause.

Written by anthropic/claude-sonnet-4.6 · Reviewed on October 15, 2026

Plain English — not legal advice.

For Property Managers

Under § PSC 113.0803, operators of multi-dwelling residential buildings and commercial properties built after March 1, 1980 generally ensure that each unit or tenant space is equipped with its own electric meter. Compliant operators review whether their property qualifies for one of the enumerated exceptions—such as participation in a statewide energy efficiency program under s. 196.374(2)(a), Stats., enrollment in an affordable housing program, or the presence of temporary commercial partitioning—before relying on master metering. Operators who believe a waiver is warranted may submit a written application to the Wisconsin Public Service Commission under subsection (5), documenting the facts that support the request.

General guidance for property managers — not legal advice for your specific situation. Consult an attorney for advice on your case.

For Tenants

Section PSC 113.0803 establishes that tenants in most residential buildings and commercial spaces constructed after March 1, 1980 have a right to individually metered electricity, which allows them to monitor and control their own energy costs directly. If a tenant believes their building is not in compliance with this individual metering requirement and no recognized exception applies, they may consider contacting the Wisconsin Public Service Commission, which oversees enforcement of this rule. Tenant-rights organizations and legal aid services can help residents understand whether their building's metering arrangement is consistent with § PSC 113.0803 and what options may be available.

General guidance for tenants — not legal advice for your specific situation. Consult a tenant-rights organization or attorney for advice on your case.

Generated October 15, 2026 — auto-generated, not yet human-reviewed. See /transparency for methodology.

Effective Timeline

Current
Oct 15, 2026
Click on timeline segments to view historical versions.

References Out

Rules and statutes cited by this regulation

Wis. Stat. § 196.374
Not yet ingested

References In

Rules and statutes that cite this regulation

Wis. Admin. Code § PSC 113.0301
Wis. Admin. Code § PSC 113.0803

Related Rules

§ 22
Definitions; submeter installation; testing; water use charges; public housing development exemption
§ 504B.216
UTILITY SERVICE IN SHARED-METERED RESIDENTIAL BUILDINGS.
§ 90.578
Conversion to submeter or direct billing for large parks.

Source Information

Snapshot SHA:
Fetched:Oct 15, 2026, 01:57 PM UTC